Merkur worked with one of its customers in aircraft manufacturing to optimize assembly operations. We applied 5S principles to the design of a new cart meeting health and safety standards.
Customer issue:
The customer faced health and safety issues when storing and moving an aircraft door lifting tool.
Requirement:
We were commissioned by their tooling department to design and deliver a specific transport cart for a set of tools to help them increase productivity and efficiency.
"
Merkur took charge of the project from A to Z, minimizing the effort required of the customer, while consulting with them regularly to stay aligned with their needs "
Eric Lorrain
Project Manager, Merkur Engineering and Manufacturing Projects team
Key results
Safety
Eliminated risk of tool falls & equipment breakage
Productivity
Reduced tool handling time
Quality
Proper storage, risk of damage eliminated
Project highlights
Deliver a turnkey transport cart custom-designed for the customer's tools
Reduce health and safety hazards: tools were unstable
Be easy to move on gangways
Manage project from A to Z
Review specifications with customer to ensure no blind spots
Carry out forklift design reviews
Customer design standard
Catia V5 software
Manufacturing workshop
Simplified project management
Work with an available, responsive and competent team
On-time delivery