Project

Merkur worked with one of its customers in aircraft manufacturing to optimize assembly operations. We applied 5S principles to the design of a new cart meeting health and safety standards.

 

Customer issue:
The customer faced health and safety issues when storing and moving an aircraft door lifting tool.

 

Requirement:
We were commissioned by their tooling department to design and deliver a specific transport cart for a set of tools to help them increase productivity and efficiency.
" Merkur took charge of the project from A to Z, minimizing the effort required of the customer, while consulting with them regularly to stay aligned with their needs "
Eric Lorrain
Project Manager, Merkur Engineering and Manufacturing Projects team

Key results

Safety
Eliminated risk of tool falls & equipment breakage
Productivity
Reduced tool handling time
Quality
Proper storage, risk of damage eliminated

Project highlights

Deliver a turnkey transport cart custom-designed for the customer's tools

  • Reduce health and safety hazards: tools were unstable
  • Be easy to move on gangways

Manage project from A to Z

  • Review specifications with customer to ensure no blind spots
  • Carry out forklift design reviews

Customer design standard

  • Catia V5 software
  • Manufacturing workshop

Simplified project management

  • Work with an available, responsive and competent team
  • On-time delivery